Pour Concrete Footing And Wall Together
One concrete pour for the footing and one for the foundation wall with the rebar and often a concrete key to hold them together.
Pour concrete footing and wall together. Load capacity of footing. The standard method of pouring a foundation involves pouring footers first and then pouring stem walls or foundation walls before pouring the floor. Without an integrated spread footing form like sonotube tube base or bigfoot i would split the pours. X 8 in 12 in ft.
In areas with a shallow frost line and stable soil carefully excavated trenches often serve as footings forms 1 and enable monolithic pours in which footing and wall concrete are placed together. The key step is keeping an eye on the opening while you pour and vibrate. Concrete foundation wall sitting on a footing weighs or applies a load to the footing of 9 ft. If concrete starts to ooze over the top of the footing move to another spot and let the concrete stiffen before you add more weight on top of it.
The trenches are dug for the footings the footings are built in place the rebar is properly located and then the concrete is poured just for the footing. In a traditional pour foundation walls are separate from the floor. When you come back to it vibrate the two pours together enough to ensure a good joint but not enough to lift the forms. Footing is placed first using very stiff concrete.
X 150 pcf 900 lbs lin. Stem wall is placed second using wetter concrete so as not to leave voids. However you may alter this construction standard by pouring a floor and footer at the same time in certain situations. The walls are formed with 2x8 lumber stacked on edge.
Place the rebar a pair of l bars spaced at 7 inches apart will center tube. The footing is contained within a trench above which forms are supported and braced by vertical and diagonal 1x2s. On the next day or after firm to firm pressure 3hrs place tube back fill carefully to keep tube centered tamp soil. Osland uses an old school method to place the footing and walls in a single pour.
The site is cleared the excavation was completed with our own equipment and now we have set up and have poured the concrete footers and stem wall for this bonners ferry garage apartment. Traditionally foundations are constructed in two phases.